New Build Pretreatment: What Florida Code Requires
Every new home in Florida receives termite protection before a single person moves in, and the paperwork proving it is fastened to…
Read article
Stages that only work in the right order, and a Certificate of Compliance most new-house owners have never once laid eyes on.
Construction hands a house exactly one chance at its cheapest termite protection, and that chance closes the moment the concrete truck shows up. Treated soil under and around a slab, put down while the fill is still open and the footings still reachable, costs a fraction of chasing that same protection through finished flooring and landscaping five years down the line. With subdivision slab construction going up across Leon County and into Wakulla County around Southwood and Crawfordville, this counts as ordinary scheduled work for builders here, coordinated between the grading crew, the plumber and the concrete pour rather than bolted on afterward.
The state spells out exactly how it is done, so either a builder or a buyer can check the work against a published standard rather than take anybody's word for it. Soil beside foundation elements gets treated by trenching, or trenching and rodding, to a minimum depth of 4 feet at 4 gallons per 10 linear feet per foot of depth, on every side of every foundation element including chimney bases, foundation walls, pilasters and pillars. Under a slab, the soil gets treated once the sub-slab fill is in and before the pour, at 1 gallon per 10 square feet, rising to 1.5 gallons per 10 square feet where the final fill is washed stone.
That treatment schedule holds the same way whether the slab sits in Tallahassee or well outside it, since soil composition drives the numbers more than city limits do. Sandy fill near Buck Lake behaves differently than the packed clay the licensed pros we connect you with encounter closer to the Apalachicola River bluffs by Chattahoochee, or the wet ground bordering the Sopchoppy River, so pre-pour treatment gets calculated on-site, not assumed from a zip code.
We run new construction termite pretreatment right across Leon County, whether you're in St. Marks, Perry, Panacea, or elsewhere around Tallahassee. Sandy fill, wood sitting close to grade and water standing in a low corner after a thunderstorm are what keep subterranean termites going in this part of Florida, so those are what the work is aimed at.
The bulk of this is private houses, and residential pest control sets out what a visit involves. Tenanted stock, shops and anything trading sits on commercial pest control.
A pretreated house ought to come with paperwork: what got applied, at what rate, and at which stage of the build. Where a builder or seller cannot produce it, treat the soil barrier as unproven rather than assumed to exist.
Where a slab gets poured without the required soil treatment, a Sub-Slab Treatment Release Form records which areas went untreated. Only the property owner should ever sign one, so a signature that is not yours sitting on a form about your own house is worth asking about.
Final grading is meant to send water away from the structure. Where it slopes the wrong way instead, the result is a permanently damp foundation and exactly the conducive condition that makes the rest of the protection work harder to hold.
The state's prevention list is explicit that form boards and grade stakes come out, and stumps, roots, wood and cellulose debris get cleared from the site before building starts. Buried lumber is food, sitting inside a treated barrier built right around it.
Treatment goes in once the footing is approved and before any concrete arrives. This is the stage that gets missed most often, since it has to be booked around the inspector's schedule rather than the crew's.
Once the foundation is backfilled inside the crawl space, the soil next to the foundation elements gets treated. Where footings sit exposed, treatment goes alongside the footing rather than beneath it, in a trench no shallower than six inches or down to the bottom of the footing, whichever comes first.
With the sub-slab fill in place and leveled, the horizontal barrier goes down at the published rate, alongside the vertical barrier around the foundation elements next to the slab. Where drain tile or French drains create a contamination hazard, the treatment has to avoid putting insecticide into the drainage system altogether.
The exterior treatment finishes the envelope off as backfill and final grading wrap up. All four stages are usually manageable in three trips with careful scheduling, and that is the difference between one coordinated job and three separate change orders.
A pretreatment protects the parts of a house nobody can ever reach again. Once the slab is down, the soil beneath it stays out of reach for the entire life of the building, and any protection there afterward has to be worked in through drilling. For a builder, that becomes warranty calls in year two. For a buyer, it becomes a treatment quote on a house that was meant to be new. The window stays short and it never reopens.
Pre-construction subterranean termite work in this state falls under Chapter 5E-14, Florida Administrative Code .0505, and it is set out in the FDACS guidance on pre-construction control, covering the four treatment stages, the trenching and rodding depths, the per-foot and per-square-foot volumes, and the rule that treatment near drain tile or French drains must not introduce insecticide into the drainage system. Because the standard is published, a builder can genuinely be held to it.
Where a slab goes down without the required soil treatment, the Sub-Slab Treatment Release Form documents the untreated areas, and it belongs to the property owner to sign. An Official Waiver of Minimum Termite Requirements form exists too. Both are records of protection that is not there, which is exactly why reading them before closing beats reading them after.
Ask what the price covers before you agree to it. A one-time treatment near Cascades Park and a year-round plan near Killearn Estates are not the same cost or the same coverage.
| One-time fix | Short-term relief | Full elimination |
|---|---|---|
| Typical Use | Pest Control Near Betton Hills, Midtown and Killearn Estates | an estimated $360–$1420 |
| Ants, roaches, wasps | why humid clay soil around Betton Hills keeps pest calls steady | an estimated $425–$2025 |
| Ongoing prevention | Pest Control Serving Betton Hills, Killearn Estates and Midtown Tallahassee | an estimated $640–$3240 |
| Subterranean termites | Termite and ant pressure near Bradfordville, Southwood, and Frenchtown homes | an estimated $1020–$5400 |
Recurring lawn and ornamental coverage tends to cost less per visit than a one-time call. Ask what a property near Lake Ella or Buck Lake would run before deciding which to book.
Alongside foundation elements: trenching, or trenching and rodding, to a minimum depth of 4 feet at 4 gallons per 10 linear feet per foot of depth. Under a slab: 1 gallon per 10 square feet of soil, rising to 1.5 gallons per 10 square feet where the final fill is washed stone. Those figures are the published minimum standards, which makes every one of them checkable.
No. Four stages tie directly to construction milestones, though careful scheduling usually gets all four done across three trips. Anybody offering a single-visit pretreatment for a slab home is not describing the state standard at all.
It gets used where a slab has been poured without the soil treatment the minimum pretreatment standards require. It tells the property owner exactly which areas went untreated, and only the property owner should ever sign one. Anybody who bought a new build should ask whether one was signed, since that is one of the most useful questions available. An Official Waiver of Minimum Termite Requirements form exists as well.
Baits for pre-construction go in only after final grade and landscaping, and they never create a barrier. They earn their place where a well is present, an area is inaccessible, or the owner has pesticide concerns, but they generally do not deliver quick control, and keeping a bait agreement running normally costs more than maintaining a conventional treatment warranty.
The state's prevention list spells out the numbers: exterior woodwork a minimum of 6 inches above ground, crawl space beams at least 18 inches above ground so future inspection stays possible, no wood-to-soil contact anywhere, pressure treated wood wherever wood meets soil, foundation ventilation laid out to avoid dead air pockets, foundation areas kept accessible, grading that carries water away, and inspections every year.
Ask outright, and get the answer in writing. What usually exists is a termite bond the builder covered for a year, with the renewal after that landing on you. Florida requires the agreement to state the exact annual renewal fee, so that figure should already sit on the paperwork. Confirm whether it runs re-treatment only before leaning on it as protection.
The paperwork is the real comparison point. Florida requires a wood-destroying organism inspection on form 13645, kept on file for three years, and a termite contract stating upfront whether it covers subterranean or drywood termites. Any Tallahassee homeowner near Southwood or Midtown can ask to see both before signing.
Slab foundations near Lake Jackson mean subterranean termite access from the ground up

Every new home in Florida receives termite protection before a single person moves in, and the paperwork proving it is fastened to…
Read article
Small round holes in a joist with powder beneath them. The question was never what made them. It is whether anything is…
Read article
On a house built in the last few years, a single form settles how much soil under the slab actually got treated…
Read articleSame day when there is room in the diary, and a real arrival window given at the time you book. Coverage runs through Tallahassee and out across Leon County.